Refuse derived fuel CHP plant Spremberg

Spremberg, Germany

The process steam supply requirements of a paper factory are by no means trivial. For one thing, a high degree of supply security must be guaranteed. At the same time, the amount of process steam required by the paper machine can vary widely depending on the operating mode. A supply facility that meets all requirements from both a technical and economic standpoint was achieved with the substitute fuel CHP plant in Spremberg. In addition to the CHP plant, two auxiliary boilers on stand-by ensure an uninterrupted steam supply to the paper factory.

In this project, TBF handled not only the overall project management but also the technical planning for all trades (construction as well as process, electrical and building services engineering) and commissioned the building in 2012 after just over two years of construction.

The plant continues to operate with great success to date.

Locations Switzerland

TBF + Partner AG
Schwanengasse 12
3011 Bern
TBF + Partner AG
Quai du Seujet 10
1201 Geneva
TBF + Partner AG
Via Besso 42
6900 Lugano
TBF + Partner AG
Beckenhofstrasse 35
Postfach
8042 Zurich

Locations Germany

TBF + Partner AG
Calwer Strasse 7
71034 Böblingen
TBF + Partner AG
Alsterarkaden 9
20354 Hamburg
TBF + Partner AG
Mauerkircherstrasse 9
81679 Munich

Location in Italy

TBF + Partner S.r.l.
Via Pola 11
20124 Milan